Expected duration: 1 day or less I need a boq and cost estimate for a structural project, just the concrete foundation broken down In an excel sheet and also like the form attached
1. Excavation of footing F1 (5-qty x 2), F2 (1-qty x 2) and Elevator shaft recess footing (1- qty x 2) – Ref. S100 2. Excavation of exterior and interior grade beams – Ref. S100 details 1,2,3,4,5,6,7 & 8/S300 3. Installation of vapor barriers for footings, grade beams and slab on grade concrete 4. Footing F1 (5-qty x 2), F2 (1-qty x 2) and Elevator shaft recess footing (1- qty x 2) – Ref. S100 5. Exterior and interior grade beams – Ref. foundation size schedule for conventional grade beams and footings on S100 and details 1,2,3,4,5,6,7 & 8/S300 6. Structural Steel anchor bolts/ embed plate per 9/S300, baseplate per 10/S300 and A211 – Floor Plan Building B&C 7. Slab of grade reinforcement with #3@12” O.C. 8. Pour 4,000psi concrete footings, beams and slab on grade.
Bantuan dana dan keuangan - 21/10/2025 06:55 EDT Category: Content Writing, Crowdfunding, Digital Marketing, Email Marketing, Fundraising, Grant Writing, Graphic Design, Marketing Strategy, Social Media Marketing Budget: ₹750 - ₹1250 INR
22-Oct-2025 03:56 GMT
Bucket Bunga Custom Spesial -- 2 Category: Creative Design, Event Planning, Photography, Time Management Budget: ₹12500 - ₹37500 INR
AI Email Automation & Templates Category: AI Chatbot Development, AI Content Creation, AI Development, AI Model Integration, AI Text To Text, AI Writing, API Integration, Email Marketing, Frontend Development, HTML Budget: $15 - $25 USD